Category: Case Studies
-

Optimast® Frangible Sign Supports for ACT Directional Guide Signs
Signfix successfully partnered with Capital Lines and Signs and JSK Concrete and Excavations to install large directional guide signs in Canberra, ACT. Utilising our Optimast® MASH TL3 frangible sign supports, we met the stringent safety standards while minimising traffic disruptions.
-

Optimast Frangible Sign supports for M1 Motorway guide sign
Signfix was recently approached by Barrier Signs to provide frangible sign supports for a large 25m2 directional guide sign along the M1 Motorway in Cundletown. Read how our Optimast 244mm x 8.0m MASH TL3 frangible signposts were the best solution for this project.
-

Signfix Australia 2022 Catalogue
-

National Works
27th National Municipal Works & Engineering Conference 2021 We look forward to seeing clients and colleagues at the Bendigo Municipal Works Conference next week. A theme about Disruption and Change, is something we became all too familiar with in 2020. A fitting theme, tailored to our industry and current situation. Please feel free to stop […]
-

Signfix Gallery
View the complete range of products in our gallery.
-
Signfix Australia 2019 Catalogue
-

Gateway WA project now complete
The Gateway WA project involved a major upgrade to the road network surrounding Perth Airports and freight and industrial hubs.
-

Signfix has moved to the Hunter
Delnorth Group has moved Signfix Australia Queensland manufacturing plant to the Hunter region.